News
05/08/2008
Bridge Footway To Stour Centre Has SSP Rubber Surface
SSP Ltd have recently completed the installation of a two colour insitu wet pour rubber surface to the bridge footpath entrance to the new swimming pool complex at the Stour Centre in Ashford, Kent. Working closely with Nusteel and the main contractor Carillion SSP completed the contract to the exacting standards required.


